Click here to go back to main page
Kliknite ovde za Srpski jezik

About us / home page
Engineering
Used machines
Technical advice
News
Contact

-
Plants for the production of "rubber" conveyor belts

-
Rubber conveyor belts regeneration (renovation) plant

-
Plants and machines in the wood industry

-
Machines and devices for the production of "NC" gunpowder

-
Machines and devices for the production of celluloid mass

-
Hydraulic presses

-
Two rollers

-
Extruders

-
Kneaders - mixers

-
Heating plates for presses

-
General overhaul of the working part of the mixer

-
Reconstructions, repairs, spare parts

-
Fire hydrants

Modernization and overhaul of machines

Two-roll mills modernization

Two-roll mills modernization

1. Replacing sliding with roller bearings
2. Roll adjustment motorizing
3. Heating / cooling closed loop circuit
4. Elastic supports

Two-roll mills overhaul

Overhaul procedure

  1. Disassembling, degreasing and washing of all parts.
  2. Shape and measurements examination of all existing parts.
  3. Rotors and chamber non-porous check.
  4. Existing parts materials and production methods determination.
  5. Decision making about parts:

- replacement
- reconstruction
- reconditioning
- satisfaction

  1. Determination of suitable technological methods for reconditioning of the existing parts.
  2. Creation of technical documents for production:

- production drawings
- lists of technological production methods
- lists of special tools required
- lists of intermediate and final check procedures

  1. Creation of technical documents for customer.
  2. Production
  3. Final checks and tests
  4. Anti-corrosive protection and packing.

Overhaul results:

Restoring of the parts and assemblies to working condition as if for a new equipment with emphasis on:

- shape tolerances
- measurements tolerances
- wear resistance




Extruder overhaul


Extruder overhaul


Extruder head manufacturing and repair

1. Adapter
2. Torpedo tip
3. Intermediate ring
4. Clamping ring
5. Centering die
6. Flange
7. Mandrel
8. Die casing
9. Torpedo
10. Head casing
11. Reducer


Overhaul procedure:

1. Disassembling, degreasing and washing of all parts.
2. Shape and measurements examination of all existing parts.
3. Rotors and chamber non-porous check.
4. Existing parts materials and production methods determination.
5. Decision making about parts:
    - replacement
    - reconstruction
    - reconditioning
    - satisfaction
6. Determination of suitable technological methods for reconditioning of the existing parts.
7. Creation of technical documents for production:
    - production drawings
    - lists of technological production methods
    - lists of special tools required
    - lists of intermediate and final check procedures
8. Creation of technical documents for customer.
9. Production
10. Final checks and tests
11. Anti-corrosive protection and packing

Overhaul results:

Restoring of the parts and assemblies to working condition as if for a new equipment with emphasis on:
- shape tolerances
- measurements tolerances
- wear resistance





Copyright © 2003 by TECOOP | Savska 12-14, 26000 Pančevo, SCG | +381 13 346 226, +381 13 346 042